The development of the energy industry largely determines the development ofthe country and should be implemented proactively, taking into account the long construction and commissioning of energy facilities. In this regard, forecasting ofthe development of the industry is carried out, which, depending on the goals and planning horizons, is divided into short term, medium-term and long term.

Short-term forecasting (1-3 years) assumes a detailed action plan for the period under review. The goal of medium-term forecasting (5-7 years) is to determine quantitative indicators and resource allocation plan. Long-term planning (more than 10 years) is carried out to make strategic decisions aimed at introducing political and technical innovations in orderto better allocate resources, achieve goals and international commitments.

Thus, medium-term planning (7 years) in Kazakhstan is fixed by the Law of the Republic of Kazakhstan "On Electric Power Industry", whereby the forecast balance of capacity and electricity is compiled annually by KEGOC JSC and approved by the Ministry of Energy of the Republic of Kazakhstan. The forecast seven-year balance is compiled in accordance with the "Rules for development of forecast balances of electric energy and capacity" and allows identifying the period of onset and the size of the shortage of electricity and capacity.

The forecast balance of capacity and electricity until 2035 was carried out in accordance with the President’s instructions given at an expanded meeting of the Government on January 25, 2021. The purpose of this long-term forecast is to consider options for covering the long-term shortage of capacity and electricity, taking into account the adopted energy development targets and the international obligations of the Republic of Kazakhstan on reduction of emission, and to assess the possible results of the decisions taken.

The forecast balance of capacity and electricity until 2035 was developed based on officially provided source data from relevant organizations, large consumers of electricity and government agencies, energy-producing organizations upon request:

•        to the Ministry of Energy (DOE) of the Republic of Kazakhstan;

•        to the Ministry of National Economy (MNE) of the Republic of Kazakhstan;

•        to the Ministry of Industry and Infrastructure Development (MIID) of the Republic of Kazakhstan;

•        to SWF "Samruk-Kazyna";

•        to Samruk-Energo JSC;

•        to Financial Settlement Center of RE LLP;

•        to power plants;

•        large consumers;

•        to electric grid distribution companies (EDC);

•        to local executive bodies (akimats);

•        to special economic zones (SEZ), etc.

Within three months (April - July 2021), total of more than 240 requests were sent, with fulfillment of 80%. The data of public organizations, NCE RK "Atameken", the election program of the Nur Otan party, etc.were taken into account.

Planning the operation of the power system includes a large number of variables and constraints; therefore, in order to find the optimal scenario of development from all possible alternatives, it is necessary to use mathematical models. Optimization models, usually, assume high requirements to computational resources, therefore, when modeling complex systems, such as energy, a reasonable determination of initial positions and assumptions is required.

The forecast balance of capacity and electricity until 2035 was developed using the ORDENA software, which allows performing long-term forecasting of energy development at the lowest cost when the specified restrictions are met. The block diagram of modeling scenarios forthe development of the power system is shown in the figure below.

1. Input data:

  • Existing grid configuration

  • Existing generating capacities

  • Electricity consumption forecast V-candidates

  • Power plants-candidates

  • Fuel cost

  • Limit on emissions

  • Indicators of renewable energy development etc.

2. Target model

for finding a combination of required investments and distribution of electricity and capacity to cover the need at the lowest cost

3. Output data:

  • New power plants

  • New overhead lines

  • Dispatching of power plants

  • System costs

  • Uncovered demand

  • CO, emissions etc.

This article will present the results of the simulation of scenarios for the development of the electric power industry of Kazakhstan (LCGP) and the resulting balance of electricity and capacity of the National Grid of Kazakhstan until 2035.

Traditionally, the development of balance begins with forecast of electricity consumption and electrical loads in the long-term, which was carried out according to three scenarios, while the "Estimated scenario" was taken as the basis according to which the electricity consumption in National Grid of the Republic of Kazakhstan would be 137 TWh in 2028 and 153 TWh in 2035. The total electric load ofthe National Grid of the Republic of Kazakhstan is projected to be 20.2 GW in 2028 and 22.7 GW in 2035, respectively.

In addition, based on the results ofthe review of the Concept and Doctrine of Low-Carbon Development (CDLCD), when analyzing the sensitivity ofthe results of optimizing the lean cost generation plan (LCGP), the Maximum scenario was additionally considered, providing active development of agriculture, electric transport, information technology (data processing centers) and a significant increase in the specific rates of municipal consumption.

According to the existing condition (2020 report), the total electricity consumption for the National Grid ofthe Republic of Kazakhstan amounted to 107 billion kWh,and the peak load was 15,8 GW.

The following are the results of modeling the optimization problem of covering the electricity and capacity needs of the National Grid of the Republic of Kazakhstan until 2035 with minimal system costs, as well as taking into account the boundary conditions for CO2 emissions, the availability and cost of fuel, CAPEX and OPEX for various generating technologies, the topology of the power system and reliability requirements.

In terms of the size and structure of generating capacities, in general, in the Republic of Kazakhstan until 2035, it is expected to increase the installed capacity by ~ 19.2 GW underthe "Green" scenario, and ~ 17.6 GW under the "Green with NPP" scenario.

According to the "Green" scenario, the main inputs account for gas generating sources (CCGT - 2.7 GW + CHP gaz - 2.2 GW + GTI - 1.1 GW = 6.0 GW), WPP (= 8.2 GW) and SPP (= 1.0 GW), as well as hydraulic power plants (HPP-0.4GW+MHPP-2.0 GW = 2.4GW).

According tothe "Green with NPP" scenario, in comparison with the "Green" scenario, the commissioning of nuclear power plants in the period 2032-2035 (= 2.4GW) leads to a decrease in inputs to the CCGT by - 0.9 GW (= 1.8 GW), and to the wind power plant by - 2.7 GW (= 5.5 GW). Inputs at hydraulic power plants are also reduced by - 0.35 GW (HPP - 0.05 GW + MHPP-2.0GW = 2.1GW).

In terms of electricity generation at power stations of the Republic of Kazakhstan in 2035:

•   According to the "Green" scenario, the share of coal- fired power plants will decrease to 40%, gas-fired power plants will increase to 24%, hydroelectric power plants, including small hydroelectric power plants, will amount to 13%, wind power plants and SPP - 23%. The total expected gas consumption will be 7.5 billion m3.

•   According to the "Green with NPP" scenario, in comparison with the "Green" scenario, the share of electricity generation at the NPP will be 12%, gas - 18%, WPP and SPP will be 17%.At the same time, the total expected gas consumption will be 6 billion m3.

CO2 emissions have been declining since 2028, reaching the unconditional targets under the Paris Agreement-15% in 2030 and continuing to decline. At the same time, at the level of 2035, the share of emissions from coal-fired power plants is 90-91%, gas- fired power plants - 9-10%.

By 2035, ICUF at the CCGT is increasing, at the GTI it is decreasing, which indicates the transition of the GTI to work in the peak of load coverage schedule. At coal-fired thermal power plants and CP, the ICUF also reduces due to the requirements for limiting CO2 emissions.

Emissions are reduced by reducing ICUF of coal-fired power plants, increasing the share of renewable energy and gas generation in the "Green" scenario, as well as by introducing a nuclear power source in the "Green with NPP" scenario.

The total inputs of generating capacities for the period up to 2035 amount to 17.6 GW,and the increase in installed capacity is 16.6 GW (the difference is due to the fact that according to the "Rules..." the outputs of the existing generation are also taken into account).

The balances of electricity and capacity for the period up to 2035, taking into account the planned optimization of the development of generation under the "Green with NPP" scenario and without it, are shown in the figure below.

ELECTRICITY BALANCE

It should be noted that in general, taking into account the planned optimization of the development of generation,the National Grid of Kazakhstan is self­ balancing in terms of electricity.

Without taking it into account, an increasing shortage of electricity and capacity is expected, which in 2030/2035 may exceed 40/60TWh and 3/7 GW, respectively.

The electricity balance for 2035 in the Northern and Western zones is formed with a deficit of 14,7 TWh and 9,0 TWh, respectively, in the Southern zone - with an excess of 22,4 TWh due to a decrease in production at coal-fired thermal power plants and thermal power plants and an increase in production at nuclear power plants, gas-fired thermal power plants and renewable energy sources, which are currently expanding in the Southern zone.

The capacity deficit ofthe Southern zone is gradually decreasing from 2.0 GW in 2022, and in 2035 the balance will be in excess of 0.2 GW. In the Northern zone, the excess capacity is gradually decreasing, and starting from 2032 the balance becomes deficient to 0.8 GW in 2035. In the Western zone, an excess capacity of up to 1.8 GW is predicted for the entire period. To cover the projected deficits in the North-South association, it is necessary to unite with Western Kazakhstan.

The main measures aimed at ensuring coverage of the projected demand for capacity and electricity in the National Grid of Kazakhstan include:

In the short term:

•        Participation of ZHGRES in full-block mode.

•        Organization of electricity import.

•        Introduction of financial responsibility to cover deviations between the projected and actual capacity of renewable energy facilities, as one ofthe incentives for the installation of energy storage systems.

•        The introduction of balancing market in real mode and the return of tariffs differentiated by the hours ofthe day to the practice for wholesale and retail consumers as the initial stage ofthe implementation of demand management program (tariff increases during peak hours and decreases during the hours of failure, especially relevant for the Southern zone).

Medium-term measures include:

•        Implementation of all planned reconstruction, expansion and modernization projects, including the commissioning of units at EGRES 1 (500 MW) and EGRES 2 (636 MW).

•        Implementation of plans for the development of gas generation (Turkestan CCGT 1,000 MW, Shymkent CCGT CHPP 450 MW, Kyzylorda CCGT 250 MW, Almaty CCGT CHPP 1-3).

•        Implementation of plans forthe development of hydraulic power industry.

•        Development of renewable energy projects and energy storage systems.

•        Construction of nuclear power plants. 












 

26.04.2024
Swiss researchers boost efficiency of vertical axis wind turbines
26.04.2024
Rapid expansion of batteries will be crucial to meet climate and energy security goals set at COP28
26.04.2024
Georgia acquires first floating solar power plant
25.04.2024
Wind turbine blades get a sustainable upgrade
25.04.2024
China restricts offshore solar PV projects to specific sea areas
24.04.2024
Biden announces $7 billion for solar energy in low-income communities
23.04.2024
Production of a solar energy storage battery has started in Vilnius
23.04.2024
Ainur Sospanova: Clear rules are needed for functioning of bilateral contracts market
23.04.2024
Process to submit applications for RES auctions to construct HPPs and WPPs has commenced in Kazakhstan
22.04.2024
JinkoSolar recognized as a Tier 1 Energy Storage Provider by BNEF
22.04.2024
Japanese satellites will transmit solar power to Earth
19.04.2024
Australia has planned a 1 GW hydroelectric power plant at former coal pit
19.04.2024
Apple ramps up investment in clean energy and water around the world
18.04.2024
Two countries in Europe are powered by 100% renewable energy as wind capacity soars
18.04.2024
IRENA’s report: Transition to renewables calls for new approach to energy security
17.04.2024
New wind power plant to be built in Baku
16.04.2024
Cost of bringing wind power plants into operation drops by more than one-third
16.04.2024
Energy ministers and leaders to discuss the future of renewable energy in Abu Dhabi
16.04.2024
Hungary boasts the EU's largest geothermal system
15.04.2024
EC adoped of the strengthened Energy Performance of Buildings Directive